Remodel Week #2
Posted by: Becca and Kyle
Our flooring arrived this week.

OK, let's get crackin'. We've got work to do!

First board:

First row:

First (half) day:

M approves.

These bars won't hold me.

I will chew my way out of here.

It'll fit. I just need to push harder.

After a long day of laying floor, it's tubby time.

M may have stayed in a little long.

Are you having a hard time putting the lawn mower together, Mom? I can do it. Let me see the instructions.

It says I need to use this thing.




All done!

I'll measure that board.

End of day 2:

Our flooring arrived this week.
OK, let's get crackin'. We've got work to do!
First board:
First row:
First (half) day:
M approves.
These bars won't hold me.
I will chew my way out of here.
It'll fit. I just need to push harder.
After a long day of laying floor, it's tubby time.
M may have stayed in a little long.
Are you having a hard time putting the lawn mower together, Mom? I can do it. Let me see the instructions.
It says I need to use this thing.
All done!
I'll measure that board.
End of day 2:
blog comments powered by Disqus